Supply Date31 Dec 2021
Contract NumberSAFAL/P/IRON ORE/11.13/2021
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberACCELERATED GERMINATION CORPORATION
Deviance0
Inward Quantity31.16
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance(not set)
Grade Deviance0
Total Cost534.08
Conversion Rate (Please insert 1 if no conversion is required)17.503
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe66.90
Mn0.22
SiO24.10
Al2O31.92
P0.162
Size 0-10MM10-150mm