Supply Date31 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.34
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance(not set)
Grade Deviance0
Total Cost3395.7
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.35
Fe3.25
SiO211.68
Al2O34.10
P0.126
Size 0-10MM2.45
Size 10-20MM2.08
Size 20-100MM48.72
Size +100MM46.75
MOISTURE0.80