Supply Date31 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.02
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance(not set)
Grade Deviance0
Total Cost3782.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.63
Fe3.95
SiO212.20
Al2O33.91
P0.124
Size 0-10MM5.02
Size 10-20MM1.08
Size 20-100MM16.80
Size +100MM77.10
MOISTURE0.80