Supply Date14 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.24
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.23
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4318.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.84
Fe3.08
SiO213.48
Al2O34.21
P0.217
Size 0-10MM5.92
Size 10-20MM3.08
Size 20-100MM17.10
Size +100MM73.90
MOISTURE0.84