Supply Date30 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity33.86
Freight22.85
Loading Charges0
Offloading Charges0
Royalty7.3
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4610.04
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.08
Fe3.46
SiO213.05
Al2O34.04
P0108
Size 0-10MM1.95
Size 10-20MM2.19
Size 20-100MM20.16
Size +100MM75.70
MOISTURE0.75