Supply Date30 Dec 2021
Contract NumberSAFAL/P/IRON ORE/11.13/2021
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberACCELERATED GERMINATION CORPORATION
Deviance0
Inward Quantity35.36
Freight345
Loading Charges0
Offloading Charges0
Royalty15
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1333.35
Conversion Rate (Please insert 1 if no conversion is required)17.503
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.45
Mn0.16
SiO23.68
Al2O31.55
P0.124
Size 0-10MM10-150mm