Supply Date30 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity49.12
Freight24.57
Loading Charges0
Offloading Charges0
Royalty6.78
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6746.63
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.36
Fe3.95
SiO213.78
Al2O34.55
P0.121
Size 0-10MM8.71
Size 10-20MM1.48
Size 20-100MM22.76
Size +100MM67.05
MOISTURE0.94