Supply Date29 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.04
Freight24.57
Loading Charges0
Offloading Charges0
Royalty7.96
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4854.09
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.16
Fe3.48
SiO210.12
Al2O34.12
P0.112
Size 0-10MM2.16
Size 10-20MM1.92
Size 20-100MM44.82
Size +100MM51.10
MOISTURE0.79