Supply Date29 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity31.46
Freight24.57
Loading Charges0
Offloading Charges0
Royalty7.99
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4359.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.24
Fe3.72
SiO210.48
Al2O33.75
P0.117
Size 0-10MM1.24
Size 10-20MM1.40
Size 20-100MM52.28
Size +100MM45.08
MOISTURE0.82