Supply Date28 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.06
Freight24.57
Loading Charges0
Offloading Charges0
Royalty7.95
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4856.51
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.12
Fe4.20
SiO29.58
Al2O33.72
P0.126
Size 0-10MM2.18
Size 10-20MM1.95
Size 20-100MM37.47
Size +100MM58.40
MOISTURE0.88