Supply Date09 Dec 2021
Contract NumberSAFAL/P/IRON ORE/11.13/2021
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberACCELERATED GERMINATION CORPORATION
Deviance0
Inward Quantity34.04
Freight320
Loading Charges0
Offloading Charges0
Royalty15
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1234.95
Conversion Rate (Please insert 1 if no conversion is required)17.503
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe65.76
Mn0.19
SiO24.10
Al2O31.68
P0.139
Size 0-10MM10-150MM