Supply Date13 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.72
Freight21.71
Loading Charges0
Offloading Charges0
Royalty8.26
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4856.85
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.08
Fe3.70
SiO29.21
Al2O33.09
P0.118
Size 0-10MM1.24
Size 10-20MM1.16
Size 20-100MM7.82
Size +100MM89.78
MOISTURE0.75