Supply Date13 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.16
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.36
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4749.06
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.26
Fe3.84
SiO211.26
Al2O34.41
P0.125
Size 0-10MM5.94
Size 10-20MM1.68
Size 20-100MM14.17
Size +100MM78.21
MOISTURE0.79