Supply Date11 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity39.24
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.74
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5315.06
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.47
Fe4.08
SiO210.47
Al2O34.52
P0.127
Size 0-10MM4.05
Size 10-20MM2.08
Size 20-100MM14.92
Size +100MM78.95
MOISTURE0.68