Supply Date27 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.16
Freight24.57
Loading Charges0
Offloading Charges0
Royalty8.17
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4739.36
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Size 0-10MM3.1
P0.11
Al2O33.75
SiO211.85
Fe1.50
Mn49.81
Size 10-20MM1.9
Size 20-100MM24.14
Size +100MM70.16
MOISTURE0.75