Supply Date26 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity40.84
Freight22.28
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5238.96
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.60
Fe1.50
SiO211.50
Al2O33.17
P0.11
Size 0-10MM2.5
Size 10-20MM3.10
Size 20-100MM63.24
Size +100MM31.16
MOISTURE0.79