Supply Date24 Dec 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity33.32
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4350.26
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.80
Fe1.50
SiO211.50
Al2O32.05
P0.12
Size 0-10MM3.5
Size 10-20MM2.61
Size 20-100MM18.08
Size +100MM75.81
MOISTURE0.96