Supply Date23 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity31.9
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.63
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4317.35
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.11
Fe4.20
SiO28.25
Al2O34.18
P0.127
Size 0-10MM1.26
Size 10-20MM1.32
Size 20-100MM29.10
Size +100MM68.32
MOISTURE0.88