Supply Date23 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.08
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.63
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4612.39
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.12
Fe4.08
SiO29.57
Al2O34.55
P0.125
Size 0-10MM2.41
Size 10-20MM1.92
Size 20-100MM13.18
Size +100MM82.49
MOISTURE0.92