Supply Date23 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.3
Freight21.71
Loading Charges0
Offloading Charges0
Royalty8.14
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4931.36
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.21
Fe3.52
SiO210.41
Al2O33.90
P0.124
Size 0-10MM2.04
Size 10-20MM1.59
Size 20-100MM11.40
Size +100MM84.97
MOISTURE0.95