Supply Date21 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.76
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.12
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4785.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.50
Fe4.50
SiO211.90
Al2O34.15
P0.12
Size 0-10MM3.10
Size 10-20MM2.90
Size 20-100MM31.10
Size +100MM62.9
MOISTURE1.5