Supply Date17 Dec 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity33.3
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.35
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3998
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.24
Fe3.75
SiO211.16
Al2O34.08
P0.127
Size 0-10MM3.75
Size 10-20MM1.90
Size 20-100MM14.10
Size +100MM80.25
MOISTURE0.92