Supply Date31 Oct 2019
Contract NumberOS/MN ORE/45/2019
ItemManganese Ore
Supplier NameLobo Chisenga (Elias Silomba)
Grade (%)Low (32% - 38%)
Lot NumberLobo Chisenga ( Elias Silomba ) mn ore
Deviance0
Inward Quantity430.513
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost25232.83
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.51
Fe2.63
SiO212.45
Al2O38.0
P0.14
Size 0-10MM10-100mm
Size 10-20MM
Size 20-100MM
Size +100MM