Supply Date18 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.02
Freight20
Loading Charges0
Offloading Charges0
Royalty7.07
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4793.18
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.32
Fe3.59
SiO211.75
Al2O34.16
P0.126
Size 0-10MM4.56
Size 10-20MM3.70
Size 20-100MM21.66
Size +100MM70.08
MOISTURE1.45