Supply Date18 Dec 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.26
Freight20
Loading Charges0
Offloading Charges0
Royalty7.03
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4823.67
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.18
Fe4.10
SiO211.48
Al2O34.34
P0.121
Size 0-10MM4.12
Size 10-20MM3.06
Size 20-100MM21.70
Size +100MM71.12
MOISTURE1.38