Supply Date16 Dec 2021
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.38
Freight20
Loading Charges0
Offloading Charges0
Royalty7.2
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4712.62
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.78
Fe3.96
SiO212.45
Al2O34.35
P0.118
Size 0-10MM1.35
Size 10-20MM1.92
Size 20-100MM6.28
Size +100MM90.45
MOISTURE0.92