Supply Date30 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.03/2021
ItemManganese Ore
Supplier NameJIANFEL WU
Grade (%)High (44% - 50%)
Lot NumberJIANFEL WU
Deviance0
Inward Quantity43.04
Freight21.66
Loading Charges0.75
Offloading Charges0
Royalty7.36
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5413.14
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.29
Fe5.26
SiO27.85
Al2O35.28
P0.124
Size 0-10MM2.40
Size 10-20MM1.92
Size 20-100MM35.59
Size +100MM60.09
MOISTURE1.08