Supply Date10 Dec 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity37.12
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.31
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5011.94
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.11
Fe4.28
SiO213.10
Al2O34.60
P0.124
Size 0-10MM3.10
Size 10-20MM1.5
Size 20-100MM15.25
Size +100MM80.15
MOISTURE0.66