Supply Date09 Dec 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.24
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.3
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4892.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.06
Fe4.21
SiO213.72
Al2O32.41
P0.121
Size 0-10MM3.42
Size 10-20MM1.65
Size 20-100MM5.21
Size +100MM89.72
MOISTURE0.57