Supply Date08 Dec 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.14
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.75
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4760.06
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.50
Fe1.62
SiO210.20
Al2O34.12
P0.14
Size 0-10MM2.10
Size 10-20MM1.5
Size 20-100MM15.74
Size +100MM80.66
MOISTURE0.50