Supply Date06 Dec 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity41.16
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.67
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5572.24
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.24
Fe3.61
SiO210.10
Al2O35.14
P0.125
Size 0-10MM6.37
Size 10-20MM1.87
Size 20-100MM41.04
Size +100MM50.72
MOISTURE0.87