Supply Date02 Dec 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity42.28
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.9
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5733.59
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.96
Fe3.72
SiO29.74
Al2O34.28
P0.127
Size 0-10MM3.72
Size 10-20MM4.64
Size 20-100MM58.94
Size +100MM32.70
MOISTURE0.90