Supply Date02 Dec 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.9
Freight21.71
Loading Charges0
Offloading Charges0
Royalty7.63
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4994.05
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.14
Fe3.57
SiO210.18
Al2O34.06
P0.128
Size 0-10MM3.45
Size 10-20MM4.27
Size 20-100MM57.63
Size +100MM34.65
MOISTURE0.82