Supply Date29 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.92
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.14
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4399.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.58
Fe4.21
SiO210.04
Al2O34.28
P0.127
Size 0-10MM3.26
Size 10-20MM2.15
Size 20-100MM62.19
Size +100MM32.40
MOISTURE0.92