Supply Date23 Nov 2021
Contract NumberSAFAL/P/MN ORE/12.28/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Low (32% - 38%)
Lot NumberKampoko Resources -LG
Deviance0
Inward Quantity38.6
Freight12.29
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2172.79
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn33.30
Fe5.92
SiO218.70
Al2O37.84
P0.162
Size 0-10MM49.28
Size 10-20MM40.14
Size 20-100MM10.58
Size +100MM0
MOISTURE6.90