Supply Date24 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.34
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.81
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4611.86
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.76
Fe4.19
SiO29.77
Al2O34.21
P0.111
Size 0-10MM2.79
Size 10-20MM1.82
Size 20-100MM61.13
Size +100MM34.26
MOISTURE1.08