Supply Date20 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.1
Freight20.48
Loading Charges0
Offloading Charges0
Royalty7.82
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4311.03
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.79
Fe4.05
SiO28.73
Al2O32.95
P0.108
Size 0-10MM3.19
Size 10-20MM1.37
Size 20-100MM55.75
Size +100MM39.70
MOISTURE0.92