Supply Date20 Nov 2021
Contract NumberSAFAL/P/MN ORE/10.02/2021
ItemManganese Ore
Supplier NameJIANFEL WU
Grade (%)High (44% - 50%)
Lot NumberJIANFEL WU
Deviance0
Inward Quantity43.16
Freight21.66
Loading Charges0.75
Offloading Charges0
Royalty6.23
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5379.46
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.45
Fe3.48
SiO21294
Al2O34.75
P0.114
Size 0-10MM4.21
Size 10-20MM2.68
Size 20-100MM43.87
Size +100MM49.24
MOISTURE1.24