Supply Date18 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.38
Freight18.44
Loading Charges0
Offloading Charges0
Royalty7.32
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4661.67
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.17
Fe3.05
SiO29.06
Al2O34.21
P0.114
Size 0-10MM2.82
Size 10-20MM1.90
Size 20-100MM67.44
Size +100MM27.84
MOISTURE0.65