Supply Date18 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.86
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.37
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4666.36
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.35
Fe3.27
SiO29.49
Al2O34.27
P0.118
Size 0-10MM3.29
Size 10-20MM2.59
Size 20-100MM60.09
Size +100MM34.03
MOISTURE0.67