Supply Date15 Nov 2021
Contract NumberSAFAL/P/MN ORE/10.02/2021
ItemManganese Ore
Supplier NameJIANFEL WU
Grade (%)High (44% - 50%)
Lot NumberJIANFEL WU
Deviance0
Inward Quantity42.84
Freight21.66
Loading Charges0.75
Offloading Charges0
Royalty8.06
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5417.97
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.96
Fe2.96
SiO27.06
Al2O33.89
P0.107
Size 0-10MM1.57
Size 10-20MM1.92
Size 20-100MM9.31
Size +100MM87.20
MOISTURE0.92