Supply Date16 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.98
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.28
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4813.04
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.03
Fe3.13
SiO212.62
Al2O33.13
P0.115
Size 0-10MM2.08
Size 10-20MM1.55
Size 20-100MM69.02
Size +100MM27.35
MOISTURE0.74