Supply Date06 Oct 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity38.34
Freight19.18
Loading Charges0
Offloading Charges0
Royalty7.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5089.64
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.18
Fe2.60
SiO29.00
Al2O33.08
P0.110
Size 0-10MM5.42
Size 10-20MM3.02
Size 20-100MM56.30
Size +100MM35.26
MOISTURE1.00