Supply Date20 Oct 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.32
Freight19.18
Loading Charges0
Offloading Charges0
Royalty7.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4688.73
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.88
Fe3.50
SiO212.78
Al2O32.85
P0.130
Size 0-10MM3.64
Size 10-20MM2.55
Size 20-100MM61.75
Size +100MM32.06
MOISTURE0.84