Supply Date02 Oct 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.975
Freight19.18
Loading Charges0
Offloading Charges0
Royalty7.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4775.68
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.08
Fe2.96
SiO28.02
Al2O32.08
P0.110
Size 0-10MM4.08
Size 10-20MM2.16
Size 20-100MM58.56
Size +100MM35.20
MOISTURE0.79