Supply Date10 Nov 2021
Contract NumberSAFAL/P/MN ORE/10.02/2021
ItemManganese Ore
Supplier NameJIANFEL WU
Grade (%)High (44% - 50%)
Lot NumberJIANFEL WU
Deviance0
Inward Quantity55.08
Freight21.66
Loading Charges0.59
Offloading Charges0
Royalty8.4
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6975.88
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.98
Fe2.97
SiO26.97
Al2O33.24
P0.105
Size 0-10MM1.18
Size 10-20MM1.72
Size 20-100MM37.88
Size +100MM59.22
MOISTURE0.94