Supply Date09 Nov 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.48
Freight18.44
Loading Charges0
Offloading Charges0
Royalty7.34
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4543.77
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.24
Fe3.10
SiO210.67
Al2O34.21
P0.120
Size 0-10MM2.75
Size 10-20MM2.15
Size 20-100MM54.90
Size +100MM40.20
MOISTURE0.72