Supply Date26 Feb 2020
Contract NumberSAFAL/P/MN ORE/02.11/2020
ItemManganese Ore
Supplier NameGeofrey Kunda
Grade (%)High (44% - 50%)
Lot NumberGeofrey Kunda- Mn Ore- MG
Deviance0
Inward Quantity24.5
Freight105
Loading Charges0
Offloading Charges0
Royalty32.5
Other Cost300
Quality Deviance0
Grade Deviance0
Total Cost1923.97
Conversion Rate (Please insert 1 if no conversion is required)14.485
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Mn44.24
Fe16.10
SiO27.60
Al2O31.90
P0.15
Size 0-10MM10-100MM