Supply Date09 Nov 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.5
Freight18.44
Loading Charges0
Offloading Charges0
Royalty7.35
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4283.18
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.29
Fe3.27
SiO210.47
Al2O33.92
P0.120
Size 0-10MM3.95
Size 10-20MM3.46
Size 20-100MM60.31
Size +100MM32.28
MOISTURE0.76