Supply Date07 Nov 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity37.08
Freight18.44
Loading Charges0
Offloading Charges0
Royalty7.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4897.9
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.25
Fe3.86
SiO29.47
Al2O34.28
P0.125
Size 0-10MM4.26
Size 10-20MM2.18
Size 20-100MM53.86
Size +100MM39.70
MOISTURE0.87